Member Center
CE for Building
Standard for CE
Other Standard
Contact Us
TeL:(+86) 025-8658 3475
Fax:(+86) 025-8658 3457
E-mail:info@hksmartps.com
Website:http://www.hksmartps.cn
CE Certification for Construction Product
Construction Product definitions:
"construction product" means any product which is produced for incorporation in a permanent manner in construction works, including both buildings and civil engineering works.
CE Certification for Construction product Essential Requirement:
The products must be suitable for construction works which (as a whole and in their separate parts) are fit for their intended use, account being taken of economy, and in this connection satisfy the following essential requirements where the works are subject to regulations containing such requirements. Such requirements must, subject to normal maintenance, be satisfied for an economically reasonable working life. The requirements generally concern actions which are foreseeable.
1.Mechanical resistance and stability
2.Safety in case of fire
3.Hygiene, health and the environment
4.Safety in use
5.Protection against noise
6.Energy economy and heat retention
System of Conformity Attestation of Construction Products:
System 1:Approved body does initial type-testing of the product, inspection and surveillance of factory production control (FPC).
System 1+:Approved body does initial type testing of product, inspection and surveillance of FPC, and audit testing of samples.
System 2:Approved body does inspection of FPC
System 2+:Approved body does inspection of FPC and continuous surveillance
System 3:Approved body does initial type-testing
System 4:Manufacture does initial type-testing and issue Declaration of Conformity (DOC)
Attestation of conformity system |
1 |
1+ |
2 |
2+ |
3 |
4 |
Duty of manufacture |
|
|
|
|
|
|
Initial Type Testing (ITT) |
√ |
√ |
√ |
√ |
√ |
√ |
Factory Production Control (FPC) |
√ |
√ |
√ |
√ |
√ |
√ |
Duty of Notified Body |
|
|
|
|
|
|
Initial Type Testing (ITT) |
√ |
√ |
|
|
√ |
|
Factory Production Control (FPC) |
√ |
√ |
√ |
√ |
|
|
Continual surveillance, Assessment and approval |
√ |
√ |
|
√ |
|
|
Tel: (+86) 400-603-6575